地处海上丝绸之路起点的后渚港,集团独资拥有5000吨级的石化专用码头,年吞吐量达70万吨。配套拥有柴油、汽油储罐和液体化工储罐,总库容约10万立方米,主要从事于柴油、汽油及内外贸易液体化工品货物的储运生产作业。
Our port is located at Houzhu, Quanzhou which was once the strart of the Maritime Silk Road. Gangfeng Group wholly owns a 5000dwt petrochemical wharf, with a capability of transporting 700000 mts cargo per year. There are tanks for storing diesel oil, gasoline and liquid chemicals with storage capacity is 100,000m³
位于南安市石井镇,拥有5000吨级石化泊位一座,仓储总库容约5万立方米,年吞吐量达40万吨。与荷兰壳牌、中石化、中海油等国内外知名企业建立合作关系,陆运半径有南安、晋江、石狮、厦门、漳州、龙岩、莆田、福州及三明等地的石油与化工厂原料的供应。
Located in Shijing Town in Nan’an, it has a 5000dwt petrochemical wharf, 50,000m³ warehouse capacity and 400,000mts’ cargo throughput per year. Our customers are enterprises from all over the world including Shell, Sinopec, ChinaOil and CNOOC.Its location allows us to meet the energy needs of nearby cities like Nan’an, Jianjiang, Shishi, Xiamen, Zhangzhou, Longyan, Putian, Fuzhou and Sanming.
Located in Shijing Town in Nan’an, it has a 5000dwt petrochemical wharf, 50,000m³ warehouse capacity and 400,000mts’ cargo throughput per year. Our customers are enterprises from all over the world including Shell, Sinopec, ChinaOil and CNOOC.Its location allows us to meet the energy needs of nearby cities like Nan’an, Jianjiang, Shishi, Xiamen, Zhangzhou, Longyan, Putian, Fuzhou and Sanming.
项目地位于惠安斗尾港区青兰山作业区,由集团投资建设,项目被列为2012年福建省重点项目。项目规划建设一个“现代石化物流园区”,分三期建设:一期为液体石化物流园区,总投资10亿元;二期为综合石化物流园区 ;三期为一期物流园区的扩建。项目2012年5月开工建设,预计2014竣工投产。
工程建设内容有:一期工程建设5万吨级石化泊位一个(可同时兼靠1艘3000吨级和1艘5000吨级船舶)。储罐总库容40万立方米,配套各种电子自动化功能系统,法定仓储货物近百种。主要运营板块有:仓储物流、金融服务、电子交易平台、产品包装、港口综合服务,国际中转保税等。
工程建设内容有:一期工程建设5万吨级石化泊位一个(可同时兼靠1艘3000吨级和1艘5000吨级船舶)。储罐总库容40万立方米,配套各种电子自动化功能系统,法定仓储货物近百种。主要运营板块有:仓储物流、金融服务、电子交易平台、产品包装、港口综合服务,国际中转保税等。
Located at Qinglan Mountain in Hui’an and financed by Gangfeng Group, the construction of the port is listed as “Key Projects” and “Five challenging Projects” in the Fujian. The project has three phases, the first phase is the liquid products zone in with investment amount of one billion RMB, the second phase is the synthetic petrochemical logistic zone and the third phase is an expansion of phase one. Construction was started on May, 2012 and is estimated to be complete in 2014.
The facilities will include a 50,000dwt petrochemical wharf which will be finished during phase one. It will be able to berth a 3000dwt vessel and a 5000dwt vessel concurrently. The warehouse capacity is 400,000 m³ and is able to store and organize over 100 kinds of products using automatic systems. The list of functions at this port are storage and logistic, financial services, electronic trading platform, product packaging, international transit tax free and other comprehensive port services.